By-law 847 / 849: Laneway & garden suites are now as-of-right on most Toronto lots · Pre-approved plans available
(416) 564-6565  ·  Mon–Sat
Laneway & Garden Suites · Toronto

Build a second home on the lot you already own.

Toronto's By-laws 847-2025 and 849-2025 made laneway and garden suites as-of-right on most lots. Bull Homes handles the eligibility check, design, permits, and full build — turnkey from first sketch to handover.

  • Free lot eligibility check — most Toronto lots qualify under the new by-laws
  • "Made in Toronto" pre-approved plans available — fast-tracks permit by 4–8 weeks
  • Compatible with the federal $80,000 Secondary Suite Loan
  • Full-service: site survey, design, permits, build, occupancy
  • Bull Homes is Toronto-licensed, Tarion-registered, BILD member
As-of-right
Most lots qualify
$3.5K/mo
Avg. legal rent
8mo
Avg. timeline
100%
Permit pass rate
The 2025 Zoning Reset

By-laws 847 + 849 changed everything.

As-of-right

No more committee approvals

Most Toronto lots can now build a laneway or garden suite without a Committee of Adjustment hearing — what used to take 12+ months and uncertain outcomes now takes weeks of permit review.

$80K

Federal funding stacks

The Canada Secondary Suite Loan Program ($80K interest-free) is fully compatible with laneway and garden suites. We help you qualify and integrate it into your build budget.

20yr

DC deferral

Toronto offers 20-year development charge deferrals for new secondary suites — worth $30K+ on most builds. We make sure you don't miss it.

Common Questions

Before you book.

Most Toronto residential lots qualify under By-laws 847-2025 (laneway) and 849-2025 (garden suite). The free eligibility check covers minimum lot width, rear-yard setback, separation distance from the primary house, and whether you have laneway access vs. street-only access. We tell you in writing.

Most builds in 2026 fall in the $350K–$650K range depending on size, finish, foundation requirements, and servicing connections. We provide a written cost range after the site assessment.

Laneway suites front onto a public laneway. Garden suites are for lots without a laneway and sit in the rear yard with a non-laneway access path. Different by-laws govern each, but both are now as-of-right on qualifying lots.

Typical timeline: 2 weeks eligibility + survey → 6–8 weeks design → 6–10 weeks permit review (faster with pre-approved plans) → 4–6 months construction. Total: 8–11 months from first call to occupancy.

Don't guess your zoning.

Free written eligibility check. Free site assessment. We'll tell you honestly whether your lot can support a suite — and what it'll cost to build.

Check My Lot